WELCOME

  • Charlottesville Tomorrow
    News Center

    The articles on this blog were published during 2005-2012. All of this content has been moved to our new website at www.cvilletomorrow.org
    © 2005-12 Charlottesville Tomorrow
    Our photos have some rights reserved.

Categories

« RTA working group ponders fall-back positions for raising revenue | Main | Natural Heritage Committee seeks funding, staff support for biodiversity efforts »

September 03, 2008

City Council approves $700K program to address pedestrian safety concerns

Reader comments (0)

2008-CC-wideshot
Audrey Dannenburg with the Virginia Department for the Blind and Visually Impaired describes how the improvements will assist those with visual impairments

City Council has approved a slate of specific recommendations to improve pedestrian safety in several key areas of Downtown Charlottesville.  Up to $700,000 will be re-allocated from the City’s budget to help pay for the improvements. Funding will come from the City’s capital budget reserve ($300,000), the City’s existing  sidewalk fund ($200,000), and traffic improvement funds ($200,000).

Podcast produced by Charlottesville Tomorrow * Player by Odeo

Listen using player above or download the podcast: Download 20080902-CC-Pedestrian-Safety

The recommendations were presented at Council’s September 2, 2008 meeting by Jim Tolbert, the City’s Director of Neighborhood Development Services. He said when implemented, the changes will make pedestrian signals more uniform throughout central Charlottesville. 

Council established a committee earlier this year to study pedestrian safety in the wake of a high-profile incident in which an Albemarle County police officer struck a man in a wheelchair as he crossed West Main Street at 4th Street NW. The committee met several times before making a series of recommendations. They recommend first making improvements at intersections along Market Street, Water Street, West Main Street, and University Avenue.  Black and white crosswalks, ramps compliant with the Americans with Disabilities Act, and countdown signals will be added in the following locations:

  • University Avenue (Ivy to JPA) – Total cost of improvements: $48,610
  • Market Street (Ridge St. to 10th St.) – Total cost of improvements: $88,425
  • Water Street (Ridge St. to 10th St.) – Total cost of improvements: $60,985
  • Main St. (JPA to Ridge St.) Total cost of improvements: $50,140

Enhanced pedestrian signals which make audible signals will be installed at priority locations, even though they might be outside of the study area.  The cost for 11 such signals is $159,930. Tolbert and Assistant City Traffic Engineer Donovan Branche demonstrated the new audible signals, which replace chirping sounds with human voices that give blind pedestrians more specific instructions such as “Emergency vehicle approaching! Clear the intersection immediately!”

Special crosswalks which flash LED lights when pedestrians are crossing will be installed in key locations such as the walkway between the Omni and McDonalds. That will cost $300,000 at six locations throughout the City.  After these improvements are installed, the Committee will measure their effectiveness before future corridors are identified.  Tolbert said the blinking lights are placed in the roadway along a crossing and flash when someone steps into the intersection.

“They’re visible during the day and the night…particularly in foggy conditions,” Tolbert said. The City has tried one of these before, on Cherry Avenue near Tonsler Park. Tolbert said the technology has improved since that time, and follows similar crosswalks installed by the University of Virginia.

Other recommendations include the creation of a $30,000 public education campaign to clarify traffic laws and signage for drivers, cyclists and pedestrians, as well as increased enforcement of traffic laws. That proposal was not included in the resolution passed by Council.

Sean Tubbs

TrackBack

TrackBack URL for this entry:
https://www.typepad.com/services/trackback/6a00d834519bec69e200e554dc9a828833

Listed below are links to weblogs that reference City Council approves $700K program to address pedestrian safety concerns:

Comments

Comment policy: First and last names are both required and anonymous comments are not allowed. Comments are moderated, and will not appear on this website until the editor has approved them.